Case study · USAID Iraq

PMO capacity building for stronger controls.

Tailored Primavera and GenAI workshops designed to improve schedule discipline and project-controls maturity.

Context

When schedule adherence and control maturity are inconsistent, teams need practical capability building alongside the systems and reporting they use. This work focused on the routines and skills that enable teams to act on project information.

Approach

Reported outcome

The existing public summary reports a 35% improvement in scheduling accuracy and control maturity. The percentage is presented as a reported project result; detailed programme data is confidential.